Request a Walkthrough

HomeServicesPost-Construction & Move Cleaning

Post-Construction & Move Cleaning

Ready for move-in. Ready for what's next.

The final clean between a build-out or a move and the first day your team uses the space. We plan it around your project dates, the building's rules, and the other trades still on site.

A newly finished, cleaned office space ready for move-in

Typical scope

What this can include.

After construction

  • Fine dust removed from accessible surfaces, ledges, and fixtures
  • Windowsills, frames, and interior glass cleaned
  • Floors cleaned to suit the material
  • Restrooms and pantry detailed and ready to use

Moving in

  • Final wipe-down once furniture is in place
  • New appliances, cabinets, and storage cleaned
  • A walkthrough with you before day one

Moving out

  • Cleaning after furniture and equipment are removed
  • Kitchens, restrooms, and floors left ready for handover

Some projects need more than one pass: a rough clean after the trades finish, then a final clean before move-in. We'll recommend what fits your timeline.

A good fit when

Who this helps.

  • You're finishing a build-out and have a move-in date to hit.
  • Your team is relocating and the old space needs to be handed back.
  • A landlord or property manager needs a suite ready for a new tenant.
  • Construction dust has settled everywhere and needs a proper clean.
Two Nomad Facilities site supervisors walking a client office together and noting what it needs

Getting started

How we set it up.

We'll review the project timeline with you or your contractor, walk the space, confirm building rules and access for the work, and schedule each pass so the suite is ready for move-in or handover.

Not part of the clean

Heavy debris hauling, hazardous materials, restoration work, and fixing construction defects aren't included. We coordinate our timing with your contractor or project manager so we're not cleaning around unfinished work.

Questions about post-construction & move cleaning

When should the final clean be scheduled?

After the trades have finished and before furniture arrives, if possible, with time for a touch-up after move-in. We'll help you place it in the project schedule.

Can the cleaning happen in stages?

Yes. Larger projects often need a rough clean and a final clean, or floor-by-floor handovers. We'll scope it to match.

What's outside the standard scope?

Debris removal, hazardous materials, repairs, and restoration. If you need any of those, tell us early so the right provider can be lined up.

Do you work with property managers and landlords?

Yes. We can coordinate directly with building management on access, insurance certificates, and freight elevator or loading dock bookings, and prepare a suite for handover to a new tenant.

Tell us about your space.

We'll set up a time to walk it with you. Post-Construction & Move Cleaning will already be selected on the form.